A bespoke fire strategy supporting a change-of-use planning application, setting out evacuation principles and construction details for Building Regulations compliance — unlocking planning approval without further queries.

Key facts

Sector
Mixed-use & change of use developments
Building type
Mixed-use scheme (change of use)
Location
London
Service provided
Fire Strategy
Project type
Change-of-use planning support
Risk profile
Design-stage — evacuation & construction principles set at strategy stage
Year
Recent

Overview

A developer needed a fire strategy to support a change-of-use planning application on a mixed-use scheme — the existing building's construction meant the strategy had to work with what was already there, not a blank sheet of paper, while still giving the planning authority everything it needed to approve the application first time.

Scope of work

  • Review of the proposed change-of-use scheme against current Building Regulations guidance
  • Development of a bespoke fire strategy covering means of escape and evacuation principles
  • Construction detail recommendations to support Building Regulations compliance
  • Strategy prepared to a standard suitable for submission alongside the planning application

Challenges identified

  • Aligning a fire strategy with a change of use rather than a new-build, where existing construction constrained the available options
  • Producing a strategy robust enough to satisfy the planning authority without triggering a further round of queries
  • Balancing evacuation principles against the practical realities of the existing building fabric

Recommendations delivered

  • Evacuation strategy and travel distances set out clearly enough to be assessed directly by the planning authority
  • Construction detail requirements identified early, before they became a design or cost problem later in the project
  • A strategy document structured so it could be referenced directly in the Building Regulations submission

Outcome

The fire strategy unlocked the change-of-use planning application, with the evacuation principles and construction details accepted without a further round of planning queries.

What clients say

Trusted across London

The assessment was thorough without being alarmist — every action came prioritised, costed in effort, and explained in plain English. Exactly what a Responsible Person needs.

Portfolio Manager
Managing agent, London

One consultant who actually understands both fire and health & safety — and provided clear compliance records so nothing slips. It has changed how we run compliance.

Operations Director
Multi-site commercial business

Responsive, precise, and pragmatic on site. The fire strategy unlocked our change-of-use application without a single round of planning queries.

Project Lead
Developer, mixed-use scheme

Facing something similar?

Get in touch to discuss how we can support fire safety and compliance for your premises or project.

← All case studies